Hoist equipment mounted on the drive on public hanger, transmission, brakes and a flexible roll up, or holding device driven extract small light weight lifting device lifting equipment.
2014年1月25日星期六
Electric wire rope hoist on the beam installation method
In addition to wire rope hoist can be used alone , but also can be used with electric trolley and crane used in combination , but in many cases it needs to be installed to run work on beam, recently there are many customers call to ask , how to install electric hoist word steel , the following introduction, I hope for your help on the hoist installation. Ready to install electric hoist equipment and accessories such as screws , first , to the hoist line and the control box link is good, then the electric car will be assembled with the I-beam to determine assembled, the liftech wire
rope hoist limited controller connected, if hoist is 380V voltage control , we can use the wireless remote control lifting equipment , and finally, the electric hoist mounted on the electric car , according to the line connecting the color , the installation is completed. Electric hoist and install car after I-beam , to trial before the normal use of cranes, ensure that the liftech wind
tubine hoist equipment and installation is no problem, before normal work
2014年1月23日星期四
Double drum lifting equipment
Two rolls have a connection with the shaft in different ways , one of which rolls through the wedge bond or liftech winch hoist thermal loading and spindle fixedly connected together, called fixed roll , also known as the death roll ; another roll slide mounted on a spindle , the spindle is connected via a clutch , so called swimming volume reduction, also known as live roll. The purpose of this structure is given to the production process to enhance the mine an elastic elongation of the rope under the load terminals , to enhance the level or multi- level conversion ascension possible relative liftech wind
tubine hoist rotation between the two reels need to adjust rope length , making the two containers are aligned with the wellhead and the bottom level.
2014年1月22日星期三
TD bucket wire rope hoist Features
1 drive power is small, the use into the feeder, induction discharge, large capacity hopper intensive arranged in almost no time material to enhance the material back and dig the material and, electric
cable hoist therefore, less reactive power.
2 wide range of upgrade, TD-type bucket elevator on the types of materials, less performance requirements, not only can improve the general powdery, granular materials, but also enhance the larger abrasive materials. Sealing, environmental pollution less.
3 good operational reliability, advanced design principles and processing methods to ensure the reliability of the machine operation, no down time more than 20,000 hours. Lifting height high. Smooth hoist operation, so you can upgrade to a higher level.
4.Feeding long life, take the elevator 1 ton chain hoist inflow style, without using excavating bucket, squeeze and collision phenomenon rarely occurs between materials. TD-type bucket elevator to ensure that the material in the design of a rare scattered when feeding, unloading, reducing mechanical wear.
2 wide range of upgrade, TD-type bucket elevator on the types of materials, less performance requirements, not only can improve the general powdery, granular materials, but also enhance the larger abrasive materials. Sealing, environmental pollution less.
3 good operational reliability, advanced design principles and processing methods to ensure the reliability of the machine operation, no down time more than 20,000 hours. Lifting height high. Smooth hoist operation, so you can upgrade to a higher level.
4.Feeding long life, take the elevator 1 ton chain hoist inflow style, without using excavating bucket, squeeze and collision phenomenon rarely occurs between materials. TD-type bucket elevator to ensure that the material in the design of a rare scattered when feeding, unloading, reducing mechanical wear.
2014年1月20日星期一
Electric wire rope hoists use precautions
An electric hoist by hand manipulation, the manipulator should fully grasp their security procedures.
2 electric hoist in use by plate lifting clamp someone to check , pay particular attention to the situation of wearing parts , found fault should be immediately cut off the main power supply , take timely measures , and carefully recorded .
When using electric hoist case 3 , the absolute prohibition is not allowed in the environment and exceed the rated load and nominal closing per hour ( 120 times ) for use under .
4 electric hoist use, must keep enough oil , and lubricants to ensure a clean and should not contain impurities and dirt.
5 When using electric hoist prohibited hoist and trolley by people , standing in lifting objects beneath strictly prohibited , prohibited under the swing state of lifting, hoisting and forbidden objects connected to the ground .
2 electric hoist in use by plate lifting clamp someone to check , pay particular attention to the situation of wearing parts , found fault should be immediately cut off the main power supply , take timely measures , and carefully recorded .
When using electric hoist case 3 , the absolute prohibition is not allowed in the environment and exceed the rated load and nominal closing per hour ( 120 times ) for use under .
4 electric hoist use, must keep enough oil , and lubricants to ensure a clean and should not contain impurities and dirt.
5 When using electric hoist prohibited hoist and trolley by people , standing in lifting objects beneath strictly prohibited , prohibited under the swing state of lifting, hoisting and forbidden objects connected to the ground .
2014年1月17日星期五
Electric wire rope hoist maintenance
When an electric hoist does not work, do not allow the weight hanging in the air to prevent permanent deformation parts .
2 electric hoist lashing cargo maintenance work must be carried out under no load condition.
3 Adjust the amount of electric hoist brake decline , should ensure that at rated load, the amount of brake slipped S ≤ V/100 (V for the load within the next minute steady lifting distance ) .
4 When oiled rope , you should use a stiff brush or a small piece of wood , prohibited direct hand rope to a working oil .
5 rope discard criteria : wire rope inspection mini electric hoist and scrap reference GB/T5972-1986 " wire rope lifting machinery inspection and scrap of practice " implementation.
2 electric hoist lashing cargo maintenance work must be carried out under no load condition.
3 Adjust the amount of electric hoist brake decline , should ensure that at rated load, the amount of brake slipped S ≤ V/100 (V for the load within the next minute steady lifting distance ) .
4 When oiled rope , you should use a stiff brush or a small piece of wood , prohibited direct hand rope to a working oil .
5 rope discard criteria : wire rope inspection mini electric hoist and scrap reference GB/T5972-1986 " wire rope lifting machinery inspection and scrap of practice " implementation.
2014年1月16日星期四
Single Column aluminum lever hoist
The series of products for indoor, widely used in star hotels , supermarkets and other industries in the lobby , aerial work inside the plant , with a lift balance, easy to operate, can enter the general hall , free access to the elevator and less power consumption , pollution , not to hurt the ground work , work that can be used against the wall and stuck his job , working no dead ends . Single column aluminum gantry cross- coupled electric lift frame attachment , very suitable for theaters , auditoriums , churches and other maintenance work. The inter- frame gantry assembly easy and effortless operation , mobile and flexible, can span up to 1.1m height vertical
drum lifter seats and other obstacles , and on the steps of a stable job. High strength rectangular steel production, good rigidity and stability. Equipped with casters , flexible . Both ends of the frame span adjustable, can be applied across different obstacles requirements. Both ends of the frame vertically adjustable and can be operated on a certain slope of ramps or stairs. Aluminum double-column lift : new design of a new generation of products , the overall use of high-strength overhead
crane refining due to the high intensity profiles that lift and swing minimal deflection . Double- masted column structure , carrying capacity, large platform area , excellent stability , flexible operation, easy to implement . It is lightweight appearance, can play a maximum lifting capacity in a very small space. The lift is widely used in factories, hotels, buildings , shopping malls , railway stations, airports, stadiums and so on. Can be used as power lines , electrical lighting , overhead pipes and other installation and maintenance, cleaning and other high-altitude
2014年1月13日星期一
Introduction to the electric hoist gantry crane girder production technology (box)
With the continuous development of Hoist
equipment economic development, the manufacturing level has been rapidly CDD Electric Chain Hoist. Electric hoist gantry crane is an indispensable equipment in building materials market, the manufacturing quality of high and low, directly affect its performance. Especially the metal structure manufacturing quality, plays an vital role in the safe use. Now to the rated lifting a total quality of 10 t electric hoist gantry crane as a case, introduced the production Hoist
and trolley, hoping to play a good reference for similar projects. The related cheap wire rope hoist parameters are as follows: electric hoist gantry crane: rated lifting the quality of 10 t; Design chief, 36 m; Door leg span 24 m; Hoisting height 9 m; The beam width 6 m; Single girder structure, the door legs into the "eight" glyph stress; Wheel bearing, two-wheel driven. Whole girder body into the box structure is long and narrow shape, the girder web plate thickness is thinner, weld, and mainly concentrated in the top side, large amount of welding. Which is the most difficult to control point is: the main girder camber, web verticality, lateral bending, and 24 m span. Because the making craft of main girder has certain representativeness, door for other structures such as beam under rigid legs, manufacturing has important reference, in the only for the three of the crane structure of main girder of the production process, talk about manufacturing technology and quality control.
2014年1月8日星期三
Ningxia special manual hoist for the first time all year zero accidents zero death
Ningxia News Network ( correspondent Li Li ) in Ningxia in 2007 to carry out special rectification lifting chainb lock based action since special equipment hidden investigation , seven hundred percent goal completed. Up to now , the region is not a serious security incidents over special equipment , not killing one person , the first time the annual Special Equipment Safety zero accidents zero death . It is understood that since last year, manual hoist dispatched inspectors to 4484 passengers, checking units 2029 , 9278 sets of inspection equipment , monitoring directive issued 954 copies of the book , discover hidden equipment 1247 units, 195 units stop running , rectification 1052 units, for investigation Case 81 , a report to the government at all levels major hidden problem 35 times , effectively ensure the safe operation of the region's special equipment . With the rapid economic development of Ningxia , the region's growing number of special equipment . In order to eliminate safety hazards special equipment , special equipment in 2007 hidden investigation and rectification work, Ningxia quality supervision departments at all levels in order to determine the metallurgical industry, lifting machinery , automotive gas cylinders , focusing on monitoring equipment as the key to the implementation of the tripartite responsibility as the starting point , closely linked to grab focus , expand areas , promote the deepening , horizontal deployment , vertical development of work plans , taking corporate self-correction based, county ( city ) Council a comprehensive inspection , investigation and technology institutions , the PUC checks, district Bureau inspector methods , focus areas, seize the key equipment, Dingsi eliminate potential dangers , has launched a special rectification lifting machinery , automotive cylinder special rectification actions. Lifting machinery for the use of units in the region of 1524 units with lifting machinery , and 81 475 sets of metallurgical enterprises lifting machinery examinations were conducted . Since May 18, 2007 began , the region's quality supervision departments at all levels to give up holidays , carried out for a period of seven months of special work cylinder car , taxi and bus companies to the site office , for businesses and users, by law only for five points without qualification modified vehicle safety inspection and the use of gas cylinders registration , supervision coordination 1958 without qualification converted natural gas vehicles for rectification , the establishment of a vehicle cylinders database , the implementation of the dynamic regulatory and administrative penalties and banned, initially established a long-term mechanism to adapt to dynamic regulation of car cylinders , and yielded good results. In addition, there had been an accident , there are security risks rectification in place yet , the foundation is weak , poorly managed , the number of devices and more focused business units focus on monitoring and regulation of major hazard as the focus , the formation of district , city and county ( district ) , security township (neighborhood ) and four companies of special equipment safety supervision and management organization, hiring staff and coordinators of special equipment information and build quality supervision station , eliminate regulatory blind spots , forming a " vertical in the end , transverse to the edge " of special equipment regulatory network , expanding the scope of regulation , supervision tentacles extended to achieve a secure special equipment " early discovery, early control , early treatment, early prevention ." According Ningxia 2008 investigation and management of special equipment hidden embodiment , Ningxia will continue to implement this national production safety committee on safety, " hidden Governance " work requirements , around the " two sessions" , "Olympic " and " Ningxia Hui Autonomous Region was established fifty Daqing "three priorities, in three phases , from special equipment safety management, safety and other aspects of the situation , carry out the region's special equipment hidden danger governance.
2014年1月5日星期日
Use electric hoist the note
Use electric hoist the note
Electric hoist is good, but when use some noteworthy aspects:
1. When lifting can not sew, tilt manual hoist heavy objects you for your cooperation.
2. When the hoist lifting, it is important to ensure that at least 3 ring steel wire rope, rope cylinder force is too large to prevent the wire rope fell off the rope drum.
3. Regularly check whether the installation of the elevator.
4. Please don't use don't overload the hoist equipment weight lifting objects when using the elevator.
5. The operating personnel please don't in the case of alcohol, medication and illness elevator operation.
6. It is forbidden to anyone standing when hoist lifting heavy objects in lifting the weight of below.
7. To manipulate when the steel wire rope, please wear with thick gloves, please don't let slip from your hand, and wire rope lest cause slippery hurt or injured.
8. The elevator to carry people in any form, or as the elevator promotion tools.
9. Please do not arbitrarily or welding of elevator parts.
10. The micro electric hoist elevator installation position must choose in consistent with the need, and easy operation.
Electric hoist is good, but when use some noteworthy aspects:
1. When lifting can not sew, tilt manual hoist heavy objects you for your cooperation.
2. When the hoist lifting, it is important to ensure that at least 3 ring steel wire rope, rope cylinder force is too large to prevent the wire rope fell off the rope drum.
3. Regularly check whether the installation of the elevator.
4. Please don't use don't overload the hoist equipment weight lifting objects when using the elevator.
5. The operating personnel please don't in the case of alcohol, medication and illness elevator operation.
6. It is forbidden to anyone standing when hoist lifting heavy objects in lifting the weight of below.
7. To manipulate when the steel wire rope, please wear with thick gloves, please don't let slip from your hand, and wire rope lest cause slippery hurt or injured.
8. The elevator to carry people in any form, or as the elevator promotion tools.
9. Please do not arbitrarily or welding of elevator parts.
10. The micro electric hoist elevator installation position must choose in consistent with the need, and easy operation.
2014年1月3日星期五
Electric hoist is mainly divided into wire rope electric hoist and chain electric hoist two kinds big
Electric hoist crane when a car and improper operation method, electric hoist can make crane swing accident. Electric hoist crane hoisting, should stop when wire rope or chain taut, electric hoist by direction again for hook, hook shaking while lifting workers chainb lock check whether "hang up; Don't too hard, when the electric hoist lifting when lifting objects from disorder may speed up the lifting; Electric hoist lifting crane content not too high, generally more than safe passage highest 0.5 m as well. Electric hoist crane runtime. Under the conditions allow, the manual hoist hanging from the ground 0.5 m or so, the rigger balance objects from behind electric hoist crane, and under the rigger command to bypass obstacles.
Don't intermittent electric hoist run time, in the long run, the best to run either for a long time as well. Electric hoist at runtime should guarantee the smooth ", if electric hoist crane swing or jitter, should be in the run run while stabilizing hook, not allow it to shake or place. Electric hoist fault occurs is normal, the service life of equipment has its specific problems we think of a solution. Sometimes, the hoist motor voltage is normal, but the gourd is not working, it should be considered for other reasons, such as: motor burned, need to change the motor maintenance. Chain electric hoist long-term need not, poor maintenance of brake wheel and the end cover rust, brake wheel does not open, when starting motor only "hum" sound, turn up, block doesn't work. At this time, should remove brake wheel, cleaning rust on the surface, and test again; Serious motor chamber, also can make the motor does not rotate, found that this kind of situation, should stop to use, must be for repair or replacement motor, to guarantee the normal work of the gourd. In addition, it is forbidden to use electric hoist overload in production, when the goods excessive overload, explosion-proof electric hoist crane didn't move the goods, the motor only thrum "hum", instead of running, serious when burning motor, or even cause an accident, should immediately stop at this moment, to reduce the goods, make the gourd work under rated power.
Don't intermittent electric hoist run time, in the long run, the best to run either for a long time as well. Electric hoist at runtime should guarantee the smooth ", if electric hoist crane swing or jitter, should be in the run run while stabilizing hook, not allow it to shake or place. Electric hoist fault occurs is normal, the service life of equipment has its specific problems we think of a solution. Sometimes, the hoist motor voltage is normal, but the gourd is not working, it should be considered for other reasons, such as: motor burned, need to change the motor maintenance. Chain electric hoist long-term need not, poor maintenance of brake wheel and the end cover rust, brake wheel does not open, when starting motor only "hum" sound, turn up, block doesn't work. At this time, should remove brake wheel, cleaning rust on the surface, and test again; Serious motor chamber, also can make the motor does not rotate, found that this kind of situation, should stop to use, must be for repair or replacement motor, to guarantee the normal work of the gourd. In addition, it is forbidden to use electric hoist overload in production, when the goods excessive overload, explosion-proof electric hoist crane didn't move the goods, the motor only thrum "hum", instead of running, serious when burning motor, or even cause an accident, should immediately stop at this moment, to reduce the goods, make the gourd work under rated power.
订阅:
博文 (Atom)