2014年9月30日星期二

Hoist equipment installed before the transfer operation


Hoist equipment installed before the transfer operation, check the wire rope, clutches, brakes, insurance ratchet, drive pulleys, etc., to determine the safety and reliability before operation.electric wire rope hoist Wire rope on the drum must be arranged in neat rows, the job should be retained at least three times. When the job, it was not allowed to cross the wire rope hoist by preventing accidents.
Hoist equipment including motor, hoist, chassis, shields and other components; using three deceleration mode,wire rope electric hoist with spiral pay transmission output torque greater. Hoist steel supporting civil overcome irregularities in order to reduce overall noise and vibration.hoist equipment with hydraulic hoist, winch hoist, doors, hand wheel hoist, hoist flashlight, hand hoist, screw hoist, dual crane hoist and so on.

没有评论:

发表评论