Electric hoist lifting heavy process requires manual control and manipulation, which is a high demand for its safe use,
rope hoist used on the preparatory work before and during use precautions, articles we have done previously introduced today, we explain the final step in the process of lifting heavy objects, electric hoist uncoupling uninstalled pay attention to what?
Wire rope hoist lifting heavy transportation in place, you should select the check good placement, electrical wiring and uninstall do not squeeze other pipelines, do not block the passage; different weights for different types of measures to be taken to assist the support, wedged, pad steady, classified display, you can not mix code, squeeze each other, but can not place vacant, has prevented a heavy rolling, side down, collapsed stack; operating personnel conducting
lift hoist hook sling hook remover should be completely relaxed after all other then make sure that all removed from the hook spreader resurgence hook, remember not shaking rope hook cord, but does not allow the use of electric hoist pump cable.
没有评论:
发表评论